Your recently viewed items and featured recommendations. var a=new Image(); a.src=img; return a; Twenty XSUM-N-2 prototypes were built, and flight-tested around 1950. (later cancelled), DD-909 to DD-916 awarded to Bethlehem Steel, Staten Island. development of Scheme "B-II" of 30 September 1941, and was the basis The Gearing design was a minor modification of the immediately preceding Allen M. Sumner class. This upgrade included rebuilding the ship's superstructure, electronic systems, radar, sonar, and weapons. The Gearing design was similar to the Sumner class but with a longer hull length of 14 feet to allow for additional fuel (giving the ship a longer range than the Sumner class) and other upgrades including AA armament . BuShips - August 3, 1945, 1947 DD-692 Class Long Their crew are active Officers of Hellenic Navy. Paulson Engineering Service, Charleston - HANGERS, NOTES for BT's, the Oil King and other engineers, Plans Lacking ASROC, the FRAM II ships were disposed of in 1969-74. The United States Navy commissioned 175 Fletcher-class destroyers between 1942 and 1944, more than any other destroyer class, and the design was generally regarded as highly successful. [5], In the late 1950s and early 1960s, 79 of the Gearing-class destroyers underwent extensive modernization overhauls, known as FRAM I, which were designed under project SCB 206[6] to convert them from an anti-aircraft destroyer to an anti-submarine warfare platform. Dimensions & Data (later cancelled), DD-812 awarded to Bath Iron Works, Bath, Maine. Forester's novel The Good Shepherd, in her appearance in the book's 2020 cinematic adaptation, Greyhound. Some went on to serve during the Korean War and into the Vietnam War.[3]. They continued serving, with a series of upgrades, until the 1970s. The Gearing class was a series of 98 destroyers built for the U.S. Navy during and shortly after World War II. As designed, the Gearings' armament was identical to the Sumners'. They were replaced as ASW ships by the Spruance-class destroyers, which were commissioned 1975-83. For individual Gearing-class ships, choose from the menu on the right. if(MSFPhover) { MSFPnav7n=MSFPpreload("_derived/dealey_class_de.htm_cmp_clearday110_hbtn.gif"); MSFPnav7h=MSFPpreload("_derived/dealey_class_de.htm_cmp_clearday110_hbtn_a.gif"); } The K-guns were retained. sending us this rare document. [5] They could cover the vast distances required by fleet actions in the Pacific and served almost exclusively in the Pacific Theater of Operations during World War II, during which they accounted for 29 Imperial Japanese Navy submarines sunk. The Gearing class is a group of 98 destroyers built for the US Navy during and shortly after World War II. Nine ships were converted to escort destroyers (DDE), emphasizing ASW. The 5-inch guns were guided by a Mark 37 Gun Fire Control System with a Mark 25 fire control radar linked by a Mark 1A Fire Control Computer stabilized by a Mark 6 8,500 rpm gyro. DD-805 to DD-808 awarded to Bath Iron Works, Bath, Maine. Due to the increasing threat from kamikaze attacks, beginning in July 1945 some ships returning to the United States for refits received further anti-aircraft modifications. Foundation; unauthorized use is PROHIBITED by Federal Law. Historical Foundation, unless otherwise stated. Introduced in 1942, the 2,100-ton Fletcher -class destroyers formed the core of the US Navy's destroyer force from 1943. United States naval ship classes of World War II, "Chao Yang-class [Gearing] Destroyer - Republic of China [Taiwan] Navy", "Destroyer Photo Index DD-873 / DDR-873 USS HAWKINS", NavSource.org Destroyer Photo Gallery index page, List of destroyers of the United States Navy, https://en.wikipedia.org/w/index.php?title=Gearing-class_destroyer&oldid=1137484913, Gearing-class destroyers of the United States Navy, World War II destroyers of the United States, Short description is different from Wikidata, All Wikipedia articles written in American English, Articles with unsourced statements from March 2016, Articles containing Chinese-language text, Creative Commons Attribution-ShareAlike License 3.0, 4,500nmi (8,300km; 5,200mi) at 20kn (37km/h; 23mph), Sold to Iran, 13 January 1975, to be broken up for spare parts, Transferred to South Korea in 1978; retired in 2000; became museum ship; scrapped December 2016, Sunk as target off Puerto Rico during ReadEx 1-83 in March 1983, Sold to the Republic of China, 12 October 1972, Ran aground and wrecked while under tow, 22 August 1977, Transferred to Republic of China, 1 June 1977, Transferred to South Korea, 23 February 1977, Transferred to Republic of China, 27 February 1981, Transferred to Greece for spare parts, 2 August 1980, Transferred to South Korea, 30 October 1972, Transferred to Republic of China, 18 April 1973, Transferred to Republic of China, 1 June 1974. Grebe was mainly intended for use against deep-diving submarines. The shipyards created plans for everything that The model build time is generally 16 weeks from receipt of the order and deposit. Preliminary design plan prepared for the General Board as part of the process PORTABLE SUBMERSIBLE PUMPS, Plans for the PIPE/SPRING A new ahead-throwing weapon called Weapon Alpha was installed in many of the ships. Conversions were carried out at Boston and Norfolk Navy Yards and involved replacing the forward torpedo tube mount with a tripod mast for height-finding radar and other systems. As the threat from kamikaze aircraft mounted in 1945, and with few remaining Japanese warships to use torpedoes on, most of the class had the aft quintuple 21-inch (533 mm) torpedo tube mount replaced by an additional 40 mm quadruple mount (prior to completion on later ships) for 16 total 40 mm guns. anti-aircraft guns on the corners of a large after deckhouse, and two triple As the threat from kamikaze aircraft mounted in 1945, and with few remaining Japanese warships to use torpedoes on, most of the class had the aft quintuple 21-inch tube mounts replaced by an additional 40mm quadruple mount (prior to completion on later ships) for 16 total 40mm guns. Gearing-class destroyer during UNITAS XIX 1978.jpg 1,862 839; 368 KB. The first ship was laid down in August 1944, while the last was launched in March 1946. Many thanks to Ed Zajkowski for The weapon of the original Fletchers). This plan was completed the day the Keel was laid for Many of the Gearings provided significant gunfire support in the Vietnam War. (later cancelled), DD-894 to DD-895 awarded to Consolidated Steel, Orange. United States naval ship classes of World War II. Robert. In June 1942, the 1.1" gun was replaced by a twin Bofors 40 mm gun mount; in some ships, another twin mount may have been added on the fantail between the depth charge racks. part of the development of the design of the Allen M. Sumner class. She was canceled 7 January 1946; her hulk was launched 7 May, but not sold for scrapping until 12 September 1961. Vivid Imagery Laminated Poster Print-20 Inch by 30 Inch Laminated Poster, The Gearing Class Destroyer: The First Gearing Class Saved for Posterity, Home Comforts The U.S. Navy Gearing-Class Destroyer USS Henry W. Tucker (DD-875) in The Waters Off Amami shima, Vivid Imagery Laminated Poster Print-20 Inch by 30 Inch Laminated Poster, USS Hollister DD-788 Adult Black Face Mask 100% Cotton/Washable Reusable/Gearing Class Destroyer, Home Comforts The U.S. Navy Gearing-Class Destroyer USS Gurke (DD-783) underway in The Gulf of Tonkin Serving as a Vivid Imagery Laminated Poster Print-20 Inch by 30 Inch Laminated Poster, Embroidered Patch - Patches for Women Man -USS SARSFIELD DD-837 Patch USN Navy Ship Gearing Class Destroyer TE YANG China, Destroyers of Brazil: Acre Class Destroyers, Garcia Class Frigates of the Brazilian Navy, Gearing Class Destroyers of the Brazilian Navy, Home Comforts The U.S. Navy Gearing-Class Destroyer USS Sarsfield (DD-837) Off Boston, Massachusetts (USA), on 23 Vivid Imagery Laminated Poster Print-20 Inch by 30 Inch Laminated Poster, Dragon Models 1/350 U.S.S. In 1945, in anticipation of the invasion of Japan, the Navy began converting 24 Gearings as radar picket ships (designated DDR in 1949) that could provide early warning of massed attack without overwhelming their Combat Information Centers. provides two twin 5"/38 dual-purpose gun mounts forward, four twin 40mm Preliminary design plan prepared for the General Board as part of the The DASH ASW drones were not acquired, but hangar facilities aboard those ships that had them were later used to accommodate ASW versions of Hughes MD500 helicopters. Fourteen were built by Bath Iron Works in Bath, Maine. unclear. if(MSFPhover) { MSFPnav2n=MSFPpreload("_derived/fletcher_class.htm_cmp_clearday110_hbtn.gif"); MSFPnav2h=MSFPpreload("_derived/fletcher_class.htm_cmp_clearday110_hbtn_a.gif"); } Running, Signal & Anchor Lights (Resolution 3663x1671 File Size 1.7 MB), Superstructure, Main Deck and In June and July 1943, two more twin Bofors mounts were added in place of the 20mm cannons in front of and below the bridge, giving a total of ten. This fire control system provided effective long-range anti-aircraft (AA) or anti-surface fire. DD-862 to DD-872 awarded to Bethlehem Steel, Staten Island. The DASH ASW drones were not acquired, but hangar facilities aboard those ships that had them were later used to accommodate ASW versions of MD 500 Defender helicopters. Sign Up Here. Some Gearings served in the Naval Reserve Force (NRF) from 1973, remaining in commission with a partial active crew to provide training for Naval reservists. FRAM I and FRAM II conversions were completed 1960-1965. into your mail program and send us your comments! FRAM II ships included six DDRs and six DDEs that retained their specialized equipment (19601961), as well as four DDRs that were converted to DDs and were nearly identical to the Allen M. Sumner class FRAM IIs (19621963). } Section & Starboard View Plans, 1968 Charleston Naval 32 torpedo tubes, DASH ASW drone, and most importantly, a new variable depth sonar (VDS). The initial design retained the Sumners' heavy torpedo armament of 10 21" (533mm) tubes in two quintuple mounts, firing the Mark 15 torpedo. This 30 September 1941 plan, for a 2180-ton (standard displacement) ship, (later cancelled), DD-815 to DD-825 awarded to Consolidated Steel, Orange. (((navigator.appName == "Netscape") && This upgrade included rebuilding the ship's superstructure, electronic systems, radar, sonar, and weapons. eliminating one bank of five torpedo tubes to achieve a less crowding amidships. Any service era or vessel configuration - We can build a model of them all - your pick. BuShips - September 4, 1951, 1954 BuShips Proposed Air Books dealing with this subject include: US Destroyers 1942-45, Dave McComb, 2010 . [13], FRAM I "A" Ships: (First 8 conversions) Removal of aft twin 5-inch gun mount (Mount 53). Forty-five commissioned before the end of the war, 62 by the end of 1945 and 91 through 1946, followed by two more (Lloyd Thomas and Keppler) in 1947, four more (Epperson, Basilone, Carpenter and Robert A. Owens, with anti-submarine warfare modifications) in 1949, and a final one, (Timmerman, with an experimental engineering plant) in 1952. Technical drawing of the Fletcher -class destroyer Launch of Fletcher and Radford, 3 May 1942 The Fletcher class was the first generation of destroyers designed after the series of naval treaties that had limited ship designs heretofore. Following World War II most of the class had their AA and anti-submarine warfare (ASW) armament upgraded. Docking Plan The first Gearings were not ready for service until mid-1945 and thus saw little service in World War II. All Rights Reserved In an attempt to replicate this . Preliminary design plan prepared for the General Board as part of the Defense Station, 1959's FRAM II (later cancelled), DD-917 to DD-924 awarded to Consolidated Steel, Orange. Frank Knox DD-742 Gearing Class Destroyer Smart Kit, US Navy Gun Destroyers 194588: Fletcher class to Forrest Sherman class (New Vanguard, 322). The FRAM MK I program was designed primarily for the Gearing-class destroyers. Group A ships also received two MK10/11 Hedgehogs fitted on each side of the bridge at the 01 level and had the MK-32 triple torpedo launchers aft of the second stack. The pace of US destroyer construction peaked in 1944 and early 1945 with the Allen M. Sumner -class 2,200-tonners. Gearing class -destroyers were of the same design, modified with a 14-foot (4.3 m) midship extension to carry more fuel to extend the ships' range. Grebe never became operational, reportedly because none of the then existing sonars could match the missile's range. Operational and Building Data During this era the ASROC system had an effective range of only 5 nautical miles (9.3km; 5.8mi), but the DASH drone allowed the ship to deploy ASW attack to sonar contacts as far as 22nmi (41km; 25mi) away. Sonar Installation Nine additional (for a total of 35) ships were converted to radar picket destroyers (DDR) in the early 1950s; these typically received only one 3"/50cal twin mount to save weight for radar equipment, as did the wartime radar pickets. // -->